top of page

As part of my final year project, I have designed a holiday accommodation at Rosemarkie Bay. The design focuses on sustainability and takes a contemporary approach, combining aesthetics and technicality into creating a quality getaway.

ROSEMARKIE HOLIDAY ACCOMMODATION

This was a challenging environment project in which in groups, we have been asked to design an emergency shelter for the UNHR Agency. The shelter had to be designed for flat-pack logistics, withstand extreme wheatear conditions and be assembled in effective time with no technical knowledge required.

Syrian Emergency Shelter

For this project we have been asked to complete Building Warrant drawings for a Warden House in Inverness. The planning consent was already gained for this development and included timber cladding, metal roof sheeting and helical piles as foundation.

Warden House

This project was part of the New West Link development in Inverness and we have been asked to design a control building for the new swing bridge at the Caledonian Canal.

Control tower

© 2017 by DT-architecture

bottom of page